Three tips for overlapping drip edge flashing.
Roof drip edge installation on existing roof.
Lift the shingles slide the drip edge underneath them and position it so that it extends over the gutters then replace the shingles and push down to seat the drip edge.
How to fix a roof drip edge installing roof drip edge flashing properly.
Coat the flat part of the flashing that sits on the deck using a putty knife.
Ask this old house general contractor tom silva demonstrates the importance of a properly installed drip edge subscribe to this old house.
When lapping the eave metal overlap them so the seam faces away from the direction of prevailing view.
Tip 2 is.
Once all the underlayment is applied go back and place.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Secure the drip edge with roofing cement.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
If it doesn t pull the drip edge out slightly from under the shingles.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Install roof drip edge along the eaves add underlayment then place drip.
How to install a drip edge.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Save yourself some.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.