Metal roof shingles require a minimum roof pitch of 3 12 or greater.
The bottom must be 18 inches and the top layer a minimum of 36 inches wide.
Mortar cannot actually bond the timber to the wall.
But since there is still a wide variety of slate roofing systems there are occasions when the minimum pitch can go down to as low as 15 0 depending on the uniqueness of the roof.
Our roof pitch is 7 12 and the roof penetration will be 4 feet away from ridge of the roof.
There must be a slope of 1 80 part h of the building regulations regarding drainage state that water should drain to one or two edges waterproofing should extend up the adjacent walls at least.
Slate and slate type shingles require a minimum roof pitch of 4 12 or greater.
Steep roof above 4 12 slope 29 cfr 1926 501 b 11.
Know the pitch of the roof and follow the appropriate standard.
The sloping timbers are known as rafters and are supported at the top by building them into the solid wall not.
For homes with a single predominant roofline the pitch of the roof must be at least five feet rise for every twelve feet of run.
One ply of smooth roll roofing complying with astm d 6380 and at least 36 inches wide or valley lining as described in items 1 and 2.
Mineral surfaced roll roofing requires a minimum roof pitch of 1 12 or greater.
Low slope roof 4 12 slope or less 29 cfr 1926 501 b 10.
With regards to the pitch the building standard code bs 5534 recommends a minimum pitch of 200 for slate roofs.