The spacing between the nails on the drip edge should be less than 12 inches apart.
Roofing felt overlap size.
Adjacent pieces of drip edge should overlap at least 2 inches 51 mm.
Roofing requirements roofing felt is required to overlap 2 inches over the lower felt course.
Overlap the end of a roll about 4 inches with the start of a new roll and fasten both pieces to the.
Continue along the roof to the other end and trim the felt flush at the end with a utility knife.
Roll out the felt no more than midway perhaps 25 feet or so across the average size roof.
Pick up the roll with both hands.
In most cases this will leave 400 square feet 37 m 2 of net coverage per 1 roll.
Never walk on felt that has not been nailed down.
The drip edge should extend at least 2 inches on the roof.
However you must allow for overlaps on joints.
Therefore a 2 inch overlap provides redundancy at the edges where the barrier is weakest.
You can see the difference between the underlayment overlapped 19 inches on the roof to the right and overlapped 2 inches on the roof to the left.
One roll of conventional 15 felt covers 432 square feet 40 1 m 2.
In steep slope roofs 4 12 and steeper the upper courses of felt underlayment should overlap lower courses by at least 2 inches.
The overlapping felt creates a secondary barrier for moisture and wicks water away from the shingles above and the sheathing below.
If there is any wind at all roll out the felt only about 10 feet.